top of page
N62473-15-D-3403 T.O. 0044
Port Hueneme Cuild Conference Room ~ Award amount $260,313.11
Larco performed demolition of existing walls, removal of existing doors, provided and installed a noise generator unit, electrical, provided and installed new fire alarms and mass notification devices at designated locations, Installed new 3-ton ductless type split system air conditioning unit, demolition of existing carpet and cove base, installed new 2’ x 2’ square tiles, installed 600 volt 20 amp disconnect for air handler system.
Replaced an existing 5 ton roof top air conditioner in room A200 with a 6 ton system and installed another new 1.5 ton AC in server room area complete and ready for use.