top of page

N62473-15-C-2213             

Erosion Control Brown St. ~ Award amount $493,544.94

​Erosion Control Project on Brown Street:

  • Installed two flood control channels.

  • Installed flood control curbing.

  • Installed 4’ boulders 95 of them.

  • Installed ground cover rocks as specified.

  • Installed weed control barrier two layers in all areas of the project.

  • Installed split face cinder block wall around sun shade for erosion control.

  • Built 18’x18’steel shade structure with slab.

  • Installed trees, bushes and headers.

  • Installed back flow preventer, irrigation control system, and necessary control valves for stations.

  • Installed necessary piping, bubblers and drip systems for trees and shrubs.

  • Installed sidewalk with hand rails.

bottom of page